| Date | TEJ2OR02 Daily Entry Points |
| 09/06/16 | Intro, survey |
| 09/07/16 | Course rev, start Tech info |
| 09/08/16 | Tech info HO, Shortcuts Ass, PT |
| 09/09/16 | Safety ppt, contract, intro to Career, TI due |
| 09/12/16 | Career, Marks, TU shortcuts, Course Outline, Safety due, PT |
| 09/13/16 | Mark update, Career ppt 1-8 and video, PT -Career report |
| 09/14/16 | Career PPT 8-16, PT, IS |
| 09/15/16 | Career PPT 16-25, video -what should I do, PT |
| 09/16/16 | Moodle registration, wiki entry, PT, Career RPT Due, on wiki by Mon. |
| 09/19/16 | Career rpt on wiki -peer/self eval, student career PPT (SPPT) first 4, U4 BoeBot kit Inventory check |
| 09/20/16 | Career SPPT 4, Boe-bot intro ppt - assign electronic definitions to take-up on Friday, cont. with kit inventory |
| 09/21/16 | Career SPPT 2, Resistor colour value chart, PT - Boebot (BB) inventory |
| 09/22/16 | Career SPPT 4, BB intro ppt cont., electronic definitions rev PT, BB inventory |
| 09/23/16 | Career SPPT 4, BB electronic definitions finish (due for Mon), PT BB inventory |
| 09/26/16 | BB def. TU, Peer Eval, Career SPPT last chance tomorrow, PT, Microcontrollers (MC) 1 rev HO |
| 09/27/16 | BB MC1 Rev 1-3, Pt, Boebot kits org. and sort |
| 09/28/16 | BB MC1 Rev 4-6, Pt Boebot kits org. and sort |
| 09/29/16 | BB MC1 Rev 7-9, PT, Boebot kits org. and sort |
| 09/30/16 | Boebot BB MC1 TU peer eval, Boebot kits org. and sort, IS, marks and FB |
| 10/03/16 | HB BB MC1 and FB, BB MC2 HO - Rev 1-3, Final sort for complete kits |
| 10/04/16 | BB MC2 HO - Rev 4-7, BB kits assigned, PT |
| 10/05/16 | BB MC2 HO - Rev 8-10, BB Board isolation, PT |
| 10/06/16 | Engineering subway video, PT |
| 10/07/16 | No Class, PD Day |
| 10/10/16 | No Class, Thanksgiving holiday Monday |
| 10/11/16 | TU MC2 peer eval, boe-bot power bars set-up, boe-bot to PC communication, PT |
| 10/12/16 | MC2 peer HB and FB, Communication with boe-bot HO, connecting to computer, software check, PT |
| 10/13/16 | Connecting boe-bots to computers, start programming 2A Ass, PT |
| 10/14/16 | boebot programming 2b, PT |
| 10/17/16 | Boebot(BB) programming 3a-b, PT |
| 10/18/16 | LED parts, operation, and circuit connection with resistance, BB programming 3c-d, PT, marking code |
| 10/19/16 | BB programming 3e and report, PT, marking code |
| 10/20/16 | PT on BB programming, report due tomorrow |
| 10/21/16 | Intro to servos ppt-s19, servo centering, PT on BB programming/report and servo start |
| 10/24/16 | Servo ppt s20-30, Dis on calibrating, PT to servo centring, calibrating, and programming report |
| 10/25/16 | Multi meter testing/demo, PT calibrating servos |
| 10/26/16 | PT on BB servo calibration |
| 10/27/16 | Rev demo on multi meter testing, Excel table editing, PT |
| 10/28/16 | PT on BB servo calibration |
| 10/31/16 | Excel line chart demo, PT continue servo calibration and multimeter readings |
| 11/01/16 | PT finish servo calibration and multimeter readings |
| 11/02/16 | PT Recap on excel file with calibration data, charts, and 10 foot calculation |
| 11/03/16 | Intro to Navigating BB PPT, Rev/demo on multimeter power measurements, PT finish calibrations |
| 11/04/16 | Navigating BB - dead reckoning challenges, HO Nav BB, PT |
| 11/07/16 | Rev Nav 1 project and HO Nav BB, PT |
| 11/08/16 | Excel line chart 10' calculation clarification, continue with Nav 1 project, PT |
| 11/09/16 | PT BB Nav 1 project continued, IS, marking |
| 11/10/16 | PT BB Nav 1 project continued, IS, marking |
| 11/11/16 | PT BB Nav 2 project start, IS, marking |
| 11/14/16 | PT BB Nav 2 project continued, IS, marking |
| 11/15/16 | Dis on mid term marks, PT BB Nav 2 project continued, IS, marking |
| 11/16/16 | PT BB Nav 3 project, IS, marking |
| 11/17/16 | PT BB Nav 3 project continued, IS, marking |
| 11/18/16 | PD Day |
| 11/21/16 | PT BB Nav 3 project continued, IS, marking |
| 11/22/16 | PT BB Nav 3 project continued, IS, marking |
| 11/23/16 | BB Custom Nav - Chart paper xy co-ordinate map, PT, chart due tomorrow |
| 11/24/16 | Finish custom Nav map on chart paper, PT, IS |
| 11/25/16 | BB Nav projects PT (Term Mark Reports handed out today in homeform) |
| 11/28/16 | BB Nav projects, PT on Nav 3 and custom nav, IS |
| 11/29/16 | PT continue on BB S curve and custom nav, IS |
| 11/30/16 | PT continue on BB S curve and custom nav, IS |
| 12/01/16 | PT BB Nav projects (last day), PT |
| 12/02/16 | PD Day |
| 12/05/16 | Take up Excel cal, BB Nav projects, Intro to circuit(cct) theory PPT, sample series cct, 1 series problem, PT |
| 12/06/16 | HB Series cct Sample, PT on second Series cct problems, parallel sample cct note copy, PT |
| 12/07/16 | Class peer take-up series cct cal, rev parallel cct theory, 2 parallel cct problems |
| 12/08/16 | Rev ohms, power, and parallel cct formulas, 2 parallel cct calculation problems, PT |
| 12/09/16 | HO units of measure and series-parallel cct cal 1 |
| 12/12/16 | Peer take up Parallel cct cal, rev units of measure, series-parallel cal 2, PT |
| 12/13/16 | PT for both units of measure series/parallel cct calculation sheets 1 & 2, IS |
| 12/14/16 | Tup series/parallel cal 1, intro to complex series/parallel ccts & Dis, redraw complex cct to simplify, PT |
| 12/15/16 | Rev complex cct to simplify, PT to finish complex cct and series/parallel cct cal 2 |
| 12/16/16 | Tup series/parallel cal 2, Tup complex cct |
| 12/19/16 | HB circuit calculations, intro to complex cct anylsis and calculation problem |
| 12/20/16 | Rev circuit formula's, Quiz, Tup in class, PT for complex cct problem. |
| 12/21/16 | HB Quiz, 5 min study, Series parallel test |
| 12/22/16 | PT - term work, movie background, IS |
| 12/23/16 | PT - term work, IS |
| 01/09/17 | Culminating overview on cct theory & wiki log, wiki template, inserting images rev, HB series parallel test, PT |
| 01/10/17 | Mechanical and digitial logic ccts, push buttons, control relays, and contacts, Logic sheet to fill-in, PT |
| 01/11/17 | Circuit design ppt, finish logic sheet, design steps on back, digital logic projects HO, PT |
| 01/12/17 | Stop/start digital logic circuit project assigned, PT |
| 01/13/17 | Solution to stop/start given, copied, assigned forward/reverse cct project, cont on wiki portfolo, PT, IS |
| 01/16/17 | Cont with wiki portfolio - 4 components related to course and digital logic, PT, IS |
| 01/17/17 | Series parallel test, PT on wiki portfolio and digital logic for/rev cct |
| 01/18/17 | Culminating projects due |
| 01/19/17 | PT to work on past due term work, and/or work on digital logic door system cct for extra term marks |
| 01/20/17 | PT cont. to work on past due term work, and/or work on digital logic door system cct for extra term marks |
| 01/23/17 | Marks updated to include culminating, Dis on work past due, PT for term work, IS feedback |
| 01/24/17 | Final class day, PT finish past due work for marks |